POWER
GENERATION, TRANSMISSION AND DISTRIBUTION
1. Feasibility Study of 166 MW Qesham Power Plant (Phase-I) (in
hand )
2. Feasibility Studies of 5.0 MW Hotreri Hydropower Project, AJ&K
(in hand )
3. Feasibility Studies of 4.0 MW Dukhari Hydropower Project, AJ&K
(in hand )
4. Feasibility Studies for Four Hydel Schemes(in hand )
5. Consultancy Engineering Services for 123 MW Combined Cycle Power
Project (Feasibility Studies) (in hand )
6. Consultancy Engineering Services for 200 MW Combined Cycle Power
Project (Feasibility Studies) (in hand )
7. Indus Tributaries High Head Hydropower Complex (Khan Khwar, Duber
Khwar & Allai Khwar) (in hand )
8. Integrated System Study and Master Planning of Power Distribution
Network in Azad Jammu and Kashmir (in hand )
9. Consultancy Services for Updating the Feasibility Study, Preparation
of Detailed Design and Tender Documents for Hydropower Stations in Punjab
(in hand )
10. Consultancy Engineering Services for 400 MW Combined Cycle Power
Project (Feasibility Studies) (completed)
11. Consultancy Services for 150 MW Combined Cycle Power Project (Pre-feasibility
Studies) (completed)
12. 5th Secondary Transmission Lines & Grid Stations under Kuwait
Fund Loan No. 488 (completed)
13. Feasibility Study of 4.5 MW Riali – II Hydropower Project
(completed)
14. Detailed Design and Resident Supervision of External Electrification
for Ch. Ghulam Abbas Kashmir Housing Colony (Purab), (Phase –
1) (completed)
15. Design Review and Construction Supervision of 3x210 MW Oil Fired
Thermal Power Station Project Jamshoro Unit 2,3&4 (completed)
16. Technical Due Diligence for Jamshoro Thermal Power Project
(completed)
17. Post Elevation Survey, Technical and Management Consultancy Studies
for Jamshoro Thermal Power Station Unit – 1 (completed)
18. Design Review and Construction Supervision of Muzaffargarh Thermal
Power Station Extension Unit 4 (completed)
19. Design Review and Construction Supervision of Muzaffargarh Thermal
Power Station Extension Unit 5 & 6 (completed)
20. Construction Supervision of 220 MW Bin Qasim Thermal Power Project
(completed)
21. Design and Construction Supervision of Co-Generation Power Plant
for Finance and Trade Center, Karachi (completed)
22. Tender Documentation and Construction Supervision of 132 kV Transmission
Line (completed)
23. Tender Documentation and Construction Supervision of Simulator for
Karachi Electric Supply Corporation (completed)
24. Design Review and Construction Supervision of 3x350 MW Fluidized
Bed Power Plant (completed)
25. Feasibility Study, Preparation of Tender Documents and Construction
Supervision of 50 MW Diesel Power Station at Saindak (completed)
26. Pre-feasibility Studies for 1800 MW Combined Cycle Power Plant at
Sahiwal (completed)
27. Feasibility Studies for 450 MW Rupali Power Project (completed)
28. Feasibility Studies for 2x67 MW Barge Mounted Power Project (completed)
29. Pre-feasibility Study of Swat River Hydropower Project. (completed)
30. Feasibility Study of Bong Escape Hydropower Project. (completed)
31. Feasibility Study of Malakand III Hydropower Project. (completed)
32. Design and Construction for Rural Electrification Projects under
OECF Loan (completed)
33. Design and Construction for Rural Electrification Projects under
IBRD Loan (completed)
34. Streamlining of High Tension and Low Tension Networks (completed)
35. Construction Supervision of Chashma Nuclear Power Project (completed)
36. Geotechnical Investigation, ESSA Report and Alternate Route Study
for B. S. Link – 1, Hydropower Project (completed)
37. Detailed Design, Preparation of Tender Documents and Construction
Supervision of Tarbela Hydropower Extension Project (Unit 5 –
8) (completed)
38. Third Tarbela Dam Inspection (completed)
39. Third Periodic Inspection of Simly Dam Project (completed)
40. Pre-Feasibility study of 5 Small Hydel Schemes on various canal
falls in Punjab (completed)
41. Designing and Resident Supervision for Remedial Measures of Cooling
Tower at Pak – American Fertilizer Limited (completed)
42. Design and Supervision services of 25 MW Captive Power Plant at
Karachi Air Port. (completed)
43. Feasibility study of Upper Jhelum Canal Hydropower Project
(completed)
44. Feasibility study of Upper Chenab Canal Hydropower Project (completed)
45. Feasibility Study of Naltar Hydropower Project. (completed)
46. Construction Supervision of Ghazi Bharotha Hydropower Project (completed) Top
>>
DAMS AND WATER RESOURCES
1. Detailed Engineering Design and Tender Documents of Basha Diamer
Dam Project (in hand )
2. Feasibility Study of Three Small Dams Package-D comprising of Tura
Warai Dam District Hangu, Rehmat Abad Dam District Karak and Sumari
Payan Dam in District Kohat (in hand )
3. Feasibility Study of Three Small Dams in District Karak” Package-C
comprising of Darmalak Dam, Nak Band Dam and Surgal Dam (in
hand )
4. Feasibility Study of Five Small Dams in District Karak” Package-B
comprising of Ghole Dam, Mardan Khel Dam, Lawaghar Dam, Karak Dam and
Bharooch Dam. (in hand )
5. Review of Detailed Design, Preparation of Detailed (in hand
)
6. Construction Drawings and Construction Supervision of Satpara Dam
Project (in hand )
7. Detailed Design and Construction Supervision of 81 MW Malakand –
III Hydropower Project (in hand )
8. Detailed Engineering Studies and Tender Documents (Preparation of
Feasibility Study, Detailed Engineering Designs and Tender Drawings
/ Documents) of Kurram Tangi Dam Multipurpose Project. (completed)
9. Review and Upgradation of Preliminary Feasibility Study of Basha
Diamir Dam Project (completed)
10. Construction of Chotiari Reservoir (completed)
11. Feasibility and Detailed Design of Pail Dam Project. (completed)
12. Feasibility Study and Detailed Design for Palai Dam Project. (completed)
13. Pre-feasibility Study of Kurram Tangi Dam Project. (completed)
14. Feasibility and Detailed Design of Changoz Dam Project (completed).
15. Feasibility and Detailed Design of Nariab Dam Project. (completed)
16. Pre-feasibility Study of Munda Dam Multipurpose Project. (completed)
17. Detailed Design of Darwazai Dam Project. (completed)
18. Feasibility Study and Detailed Design of Zaibi Dam Project. (completed)
19. Third Periodic Inspection of Simly Dam Project (completed)
20. Supervision of M&R/ADP Works of Irrigation Structures (completed)
21. Supervision of M&R/ADP Works of Irrigation Structures (completed)
22. Supervision of Construction of Safety Works of Irrigation Structures
(completed)
23. Design Review and Resident Supervision of Rehabilitation Works /
Re-Construction of Head Regulators on Main Canals (completed) Top>>
ECONOMIC
AND FINANCIAL STUDIES
1. Economic and Financial Studies for 123 MW Combined Cycle Power Project
(Feasibility Studies) (in hand )
2. Economic and Financial Studies for Kurram Tangi Dam Multipurpose
Project. (in hand )
3. Consultant to Private Power Cell in the capacity of Financial Advisor
(completed)
4. Economic Studies, Financial Analysis and Determination of Lower Tariff
for Malakand – III Hydropower Project (completed)
5. Economic Studies and Financial Studies for 5 x 10 MW Nizampur Thermal
Power Project (completed)
6. Economic Studies and Financial Studies for 45 MW Bong Escape Hydropower
Project (completed)
7. Economic Studies and Financial Studies for 97 MW UJC Hydropower Complex
(completed)
8. Economic Studies and Financial Studies for 11 MW UCC Hydropower Project
(completed)
9. Economic Studies and Financial Studies for Phase – I, Murree
Sanitation Project (completed)
10. Environmental Impact Studies (EIA) of 4.5 MW Riali – II Hydropower
Project (completed)
11. Economic Studies and Financial Studies for Naltar Hydropower Project
(completed)
12. Economic and Financial Studies of 4.5 MW Riali – II Hydropower
Project (completed)
13. Economic and Financial Studies for 150 MW Combined Cycle Power Project
(completed) Top
>>
ENVIRONMENTAL
ASSESSMENT AND POLLUTION CONTROL
1. Environmental Studies of Kurram Tangi Dam Multipurpose Project. (in
hand )
2. Environmental Studies of 123 MW Combined Cycle Power Project (in
hand )
3. Environmental Impact Assessment (EIA) Studies for Bin Qasim International
Terminal Limited (completed)
4. Environmental and Social Soundness Assessment (ESSA) Studies for
Barge Mounted Power Project (completed)
5. Environmental and Social Soundness Assessment (ESSA) Studies for
Barge Mounted Power Project (completed)
6. Environmental and Social Soundness Assessment (ESSA) Studies for
Nizampur Thermal Power Station (completed)
7. Environmental and Social Soundness Assessment (ESSA) Studies for
B.S. Link – 1, Hydropower Project (completed)
8. Environmental and Social Soundness Assessment (ESSA) Studies for
Bong Escape Hydropower Project (completed)
9. Environmental Impact Assessment (EIA) Studies for Almas Thermal Power
Plant (completed)
10. Environmental Impact Assessment (EIA) Studies for Manzer Power Plant
(completed)
11. Environmental Impact Assessment (EIA) Studies for 18 MW Hydropower
Project (completed)
12. Initial Environmental Examination (IEE) Report for two 140 ft. Dia
Naphtha Storage Tanks at National Refinery Limited Keamari Terminal,
Karachi (completed) Top
>>
ARCHITECTURE
AND TOWN PLANNING
1. Detailed Design and Construction Supervision of Divisional Public
School for Girl’s Branch at Township, Lahore
(in hand )
2. Consultancy Services for Design / Conservation / Rehabilitation /
Renovation / Other Works and Top Supervision at Haveli Dhayan Singh
(in hand )
3. Design and Construction Supervision of Haveli Dhiyan Singh II &
III for Girls College (completed)
4. Design Review and Top Supervision of 8 Storeyed Ibrahim Trade Centre
(completed)
5. Design and Construction Supervision of 11-Storeyed Car Parking Plaza,
Lahore (completed)
6. Design Review and Detailed Supervision of the Construction of 572
No. Flats for Beach Avenue Project (completed)
7. Design and Construction Supervision of Administration Building, Water
Supply and Sewerage System for 125 MW Saba Thermal Power Project (completed)
8. Extension works of Layyah Sugar Mills, Layyah (completed)
9. Design and Construction Supervision of 4-Storey Commercial Building,
Lahore (completed)
10. Construction Supervision of Powerhouse Building (4 storey), Administration
Building, Residential Colonies, Water Supply and Drainage Works, Internal
Roads for 3x210 MW Oil Fired Thermal Power Station Project Jamshoro
Unit 2,3&4 (completed)
11. Design Review and Construction Supervision of 59 No. Buildings,
Water Supply and Sewerage Works, Internal Roads, Main Line for Water
Supply from Indus River to Water Treatment Plant, Powerhouse Block and
Residential Colony for 3 x 50 MW Fluidized Bed Power Plant, Lakhra
(completed)
12. Design Review and Construction Supervision of Administration Block,
Workshops, Main Powerhouse Building, Internal Roads, Water Supply and
Sewerage Works, Storm Drainage Works for Chashma Nuclear Power Project
(completed)
13. Construction Supervision of Control Building, Administration Building,
Water Treatment Building, Internal Roads, Water Supply and Sewerage
Works and Residential Colony for 586 MW UCH Power Plant (completed)
14. Construction Supervision of Administration Building of 40 MW Nizampur
Thermal Power Station (completed)
15. Construction Supervision of Administration Block, Powerhouse Building
and Residential Colony for Muzaffargarh Thermal Power Station Extension
Unit 4 (completed)
16. Construction Supervision of Administration Block, Powerhouse Building
and Residential Colony for Muzaffargarh Thermal Power Station Extension
Unit 5&6 (completed)
17. Planning/ Design and Construction Supervision of Board Complex along
with Town Planning of the Site (completed) Top>>
SEWERAGE,
WATER SUPPLY AND DRAINAGE
1. Resident Supervision of Construction of five (5) Sewerage and Drainage
Schemes in various areas of Gujranwala (completed)
2. Resident Supervision of Construction of Roads and Drainage Works
in Walled City, Lahore (completed)
3. Walled City Circular Road Drainage, Project (completed)
4. Feasibility Study and Preparation of PC-I, Detailed Design and Tender
Documents for Phase-I, Murree Sanitation Project (completed)
5. Installation / construction of 14 nos. 4 cfs capacity tubewells in
different constituencies of Lahore (Resident Supervision). (completed)
6. Installation / construction of 6 nos. 4 cfs capacity tubewells in
different constituencies of Lahore (Top Supervision). (completed)
7. Top supervision of construction of road and drainage works from Civil
Lines Disposal Station to Rajkot Disposal Station, Gujranwala (completed)
8. Installation / construction of 4 nos. 4 cfs capacity tubewells at
Madhu Lal, Awan Town, Makkah Colony and
Greet Town Lahore (TopSupervision) (completed) Top>>
BRIDGES
AND ROADS
1. Preparation of Design of two bridges over Indus river near Besham
for 163 MW Allai Khwar Hydropower Project. (completed)
2. Extension works of Layyah Sugar Mills, Layyah (completed)
3. Study of 700 Km. access road from Karachi to the site for 50 MW
Saindak Diesel Power Station. (completed)
4. Geotechnical Investigation and Alternate Route Study for B. S.
Link – 1, Hydropower Project (completed).